Commercial Projects

Canaport LNG Terminal Marine Construction

The Canaport LNG Terminal in Saint John, New Brunswick, required complex marine construction and heavy-lift operations in deep-water conditions.

Dan Mahnke served as Marine Operations Manager, overseeing the installation of 48-inch steel piles extending 180 feet and 400-ton offshore jackets. The work required coordination of multiple marine cranes, diving operations, two 600-ton barge cranes, and two jack-up barges to support construction of the terminal infrastructure.

Previous
Previous

US 95 Pend Oreille Long Bridge Rehabilitation

Next
Next

ThyssenKrupp River Marine Terminal Construction